Main bathroom




This was a severely water damaged second floor bedroom. there was a massive roof leak that worked its way in the valley adjacent to the chimney. After we repaired any framing affected by the water all of the damage was able to be repaired and heavily skim coated to match the remaining plaster. Wood trim was routed to match existing and electrical wiring was also replaced.
Second Floor bedroom






This was a severely water damaged second floor bedroom. there was a massive roof leak that worked its way in the valley adjacent to the chimney. After we repaired any framing affected by the water all of the damage was able to be repaired and heavily skim coated to match the remaining plaster. Wood trim was routed to match existing and electrical wiring was also replaced.